ANALYSIS OF CONTRACT CHANGE ORDER (CCO) COSTS IN BUILDING CONSTRUCTION PROJECTS
DOI:
https://doi.org/10.46799/ajesh.v2i12.211Keywords:
change order, contract, building construction projectAbstract
In every project implementation, one of the things that often occurs is change orders, namely changes to work that occur after the contract is signed by the work owner and implementing contractor. Most change orders occur due to the desire to change the design or related to budget adjustments by the work owner. The change order proposed by the contractor was due to differences between the design plan and the bill of quantities, the design lacked detail, the design did not suit field conditions, changes in implementation methods because the design was difficult to carry out, and difficulties in mobilizing materials according to technical specifications. Change orders that are not handled properly can potentially cause additional costs, additional time and decreased contractor performance. To minimize change orders, change order correlation analysis can be carried out using original data, with the parameters change order ratio (COR), change order ratio in addition (CORA) and change order ratio in subtraction (CORS). The data used in this study uses six original change order contract data on building construction projects which have initial contract data and cost data after the change order occurs. The results of COR, CORA, and CORS calculations are analyzed and described according to project conditions This study produced three conclusions, the average Index Change Order Ratio (COR) for the six research study object projects was 26%. This means that the 6 study object projects experienced a proportion change of 26% from the original contract value. The average Change Order Ratio in Addition (CORA) index for the six research study object projects is 16%. This means that of the 6 study object projects experiencing change orders, 16% were due to additional work from the original contract value. The average Change Order Ratio in Subtraction (CORS) index for the six research study object projects is 10%. This means that of the 6 research study object projects that experienced change orders, 10% were due to the work being less than the original contract value.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Wahyu Pratondo Wibowo

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.