Strategic Decision Analysis in Mine Planning to Achieve Coal Production Target due to Mud Accumulation: A Case Study at Pit Garuda, PT Bara Nusantara Energi
DOI:
https://doi.org/10.46799/ajesh.v4i6.644Keywords:
Coal Production, Mud Management, Mining,, Kepner-Tregoe, SMART Analysis, Fishbone DiagramAbstract
Coal remains a vital energy resource worldwide, particularly in developing countries, due to its affordability, wide availability, and essential role in meeting growing electricity and industrial demands. This study aims to develop strategic decisions in mine planning to achieve coal production targets despite the challenges posed by mud accumulation at Pit Garuda, PT Bara Nusantara Energi (BNE). This mud, which has accumulated over several periods and now totals 981,254 m³ at Pit Garuda area as of June 2024, causes the coal area to be submerged, so the coal-getting process cannot be carried out. The method used in this research is the Kepner-Tregoe approach, which consists of four stages: Situation Appraisal (SA), Problem Analysis (PA) using the Fishbone Diagram, Decision Analysis (DA) with a Simple Multi-Attribute Rating Technique (SMART) method, and Potential Problem Analysis (PPA) to anticipate implementation risks. Data were collected through interviews, Focus Group Discussions, questionnaires, and secondary data from operational reports and company technical documents. Three alternatives for handling mud were evaluated: conventional loading, slurry pump to void, and slurry pump with geotube. These alternatives were analyzed using SMART based on six score attributes: preparation, additional treatment, productivity, availability of storage, safety, and environment. The results showed that the slurry pump-to-void method is the most efficient solution. Although it has the highest cost (112.32 billion rupiah), it also achieved the highest overall score (61.17 points). This method is considered effective for quickly overcoming operational challenges and aims to process 2,289,592 m³ of mud within 3.5 months. The study recommends immediately adopting the slurry pump to void alternative, supported by intensive supervision and a well-planned risk management strategy. This approach will help ensure smooth production and prevent potential issues, such as insufficient mud storage capacity, inefficient pumping, depletion of mud before the project is finished, and delays in the arrival of pumping units.
Downloads
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Juniardi Sukmana, Yos Sunitiyoso

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-ShareAlike 4.0 International. that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.