Return to Article Details
Evaluation of the Project Cost Budget Plan for the XYZ Data Centre Construction Project Using My SMM and Regulation of the Director General of Construction Development No. 182 of 2025 Based on a WBS Integrated with Bim and Risk Analysis to Improve Cost Accuracy
Download
Download PDF